
Technology Forum
Several Common Problems and Solutions in the Installation of Municipal Water Sup
Hubei AD Building Materials Co., Ltd., as a professional PE double-wall corrugated pipe manufacturer, has been committed...
View details Double wall corrugated pipe construction manual
Contact number: 17399989993 double-wall corrugated pipe construction manual provides professional construction guidance,...
View details Construction method of trenchless pipe drawing, PE towed pipe construction
Contact number: 17399989993 professional provides trenchless pipe construction, PE tractor pipe construction services, u...
View details HDPE water supply pipe hot melt docking process~ AD PE pipe
Contact number: 17399989993 HDPE water supply pipe hot melt docking process forms high-strength welding through high-tem...
View details HDPE steel mesh skeleton composite pipe construction animation detailed explanat
Contact number: 17399989993 super detailed HDPE steel mesh skeleton composite pipe construction animation, through three...
View details Construction Control of Trenchless Directional Drilling for PE Drainage Pipe
Analysis of construction control points for trenchless directional drilling of PE drain pipes! Covers core technologies ...
View details Welding and Laying of PE Pipe in AD
Contact number: 17399989993 AD PE pipeline welding and laying adopts standardized processes such as hot melt docking and...
View details Construction steps and product specifications of PE plum blossom pipe
The construction steps of PE plum blossom pipe include pipe trench excavation, pipeline laying, interface connection and...
View details Construction steps, precautions and physical properties of PVC-U drainage pipe
Tel: 17399989993 PVC-U drainage pipe construction steps include measuring pay-off, pipe cutting, sealing apron/bonding/f...
View details PPR管材簡(jiǎn)介、安裝步驟、 管材性能
一、般規(guī)定(1) 公元PPR管適用輸送介質(zhì)溫度為0-70C。(2) 武漢PPR管材采用S6、S5、S2、S3.2、S2.5、S2等級(jí),管件采用S2.5將級(jí),相對(duì)
View details